| << Newer | Older >> |
on 2008/3/25 2:20:11

The newly opened Rajiv Gandhi International airport at Shamshabad has opened to some mixed repose by passengers. The sprawling Greenfield airport looks majestic amidst vast expenses of greenery. The airport is a visual treat with open structure with glass frontage.
The airport has three levels. The ground floor has been reserved for car parking. The first floor is for arrivals and the second level is for departures. The airport offers a majestic view of the runway and also the parked aircraft in the parking bay. Children in particular are enjoying the majestic view, the escalators and the colourful aircraft belonging to different airlines parked in the parking bays.
The only glitch is that the airport is a bit too far from any point in the city. The inner ring road and the outer ring road will take at least another one year to complete. The PV Narasimha Rao expressway from Masab Tank to the airport is also likely to take anywhere between 6 to 9 months to be completed. Till then the passengers will have to bear the traffic snarls and bottlenecks at various points to the airport.
The comments are owned by the poster. We aren't responsible for their content.
| Poster | Thread |
|---|


